Beijing 010-51697538/40   Shanghai 021-61900630   Guangzhou 020-61130060   Shenzhen 0755-61289740
Home About Us Our Service Head Hunting Job Seeker Our Clients Info.& Resources Contact Us
 
Jobseeker Resume
 
You are here: Home > Search Candidate > Jobseeker Resume
Jobseeker Center
Employer Center
Jobseeker Resume

(Here is the basic personnel information, to download the complete file resume (doc, pdf, etc.) and view Contact, you need to become an official corporate member and get the permission)

ATTN: Our job seeker information database is only for job recruitment, it is illegal if anyone use it for other purpose.

Update: 2016-3-13
 Basic Information:
 CV No.:  14172   
 Gender:  Male
 Age:  56
 Country of Birth:  India
 Nationality:  India  Native Language:  English
 Current Residence:  Overseas(United Arab Emirates)  Chinese Level:  I Can't Speak
 Industry:  
 Detail Information:
 Desired Industry:    Education:  College/University
 Desired Job Type:  Full Time  Major:  Petroleum and petrochemical
 Monthly Salary  Expectation:  Negotiable Yuan RMB/Month  Your total working  experience:  >15 Years
 You want to say to  the employers:  
 Experience:
 Education Infomation:
Educational Attainment : BE

Name of School: SHIVAJI UNIVERSITY Year of Graduation :1989



 Working Experience:
WORK HISTORY

I am a Senior Mechanical Engineer with +27 years’ experience in Mechanical Engineering. I have worked in FEED, EPC, PMC projects, Equipment Vendor inspection and site construction, Plant Operating and Maintenance experience of Rotating, Package and Mechanical Handling Equipment.

During my career, I have been involved with many diverse Maintenance activities ranging between small Pump over-hauling to the whole Plant Emergency Shut Down and Planed Turn Around Maintenance (TAM). My experience has been gained in all Disciplines; both Mechanical day to day troubles shooting and long investigation studies. Beside My experience in operation, design and construction, I have also involved in many vendors workshop inspection, testing, expediting and joined vendor qualification team of various equipment vendors around the globe.


-Rich experience in the process design of oil & gas projects.
- Engineering calculations, design, simulation and equipment specifications.
- Process General Philosophies and drawings (PFD, UFD, P&IDs).
- Experience in Conceptual, FEED, Basic and Detail Engineering of Brown and Green Field Projects.
- Good experience in the Design of offshore, onshore, Oil and gas, Wellhead, refinery, petrochemical, Utilities and off-site.
- Procurement services, Technical Bid evaluation, Vendor Interface and document review and approval.
- Participating in HAZOP and have a very good knowledge of process safety and area classification.
- Proficient in using software’s such as: HYSYS, Aspen Plus, Aspen B-Jac, Aspen ACOL
- Good knowledge in using software’s such as Office programs, AutoCAD, Searching Internet resources.

CORE COMPETENCIES

▪ Management of Change Process ▪ EPC Contractors Coordination
▪ Punch List Clearance ▪ Site Engineering Query
▪ Project Planning ▪ Risk Assessment
▪ Client Management ▪ Vendor Management
▪ Time Management ▪ Project Coordination
▪ Contract Negotiation ▪ Team Building

I am well experienced in maintenance/ installation and Overhauling of Static / Rotating Package Equipment, i.e Process Heaters, Heat Exchangers, Air fin Coolers, Columns, Vessels and Valves. Took part to prepare technical / commercial proposals in response to tender invitations, conducted job risk assessments, prepared method statements for different activities, well understands the P & ID, PFD, General arrangement, Isometrics, plans, Sectional drawings,Lead the team of multinationals sub ordinates (supervisors/Engineers) the workforce by an excellent exposure to work with western national colleagues /superiors.

Attending regular Quality/Construction meetings. Strong Analytical, Problem solving, Innovation, Adaptability and Learning skills. Taking part in equipment modification’s schemes, Delivered Presentations on different subjects of mechanical discipline. Review of technical documents, design review, management reports, method statements, procedures, CV short listing, conducting interviews for new hires. A proven experience to Quality Control / Assurance in Oil and Gas. Represented Inspection Department during Kick of Meetings (Proposal, Engineering & Construction Phases)
I have over Rich experiences in Oil, Gas & Petrochemical related industry specializing in Engineering Design and Engineering Project Management (EPM). My specific experiences covers; Proposal, Conceptual Engineering (pre-FEED), FEED (Front End Engineering Design), Detailed Design, Purchasing, Testing, Erection, Hook-up, Commissioning (EPCC) and start-up for major Rotating Equipment’s with reputable Engineering Design Consultant, EPC Contractor

Specialties:

Engineering Design, Conceptual Study / Pre-FEED, Front End Engineering Design (FEED), Detailed Design, EPCC, Technical Bid Evaluation, Design Review, Testing, Installation, Hook-up, Pre-commissioning and Commissioning for the Turbo-Compressor (Export Gas / Sales Gas / Gas Booster / Gas Injection / Gas Lift), Turbo-Generator, Motor Driven Compressor, Gas Engine Driven Compressor, Turbo-Expander, Steam Turbine Generator, Emergency Diesel Generator, Gas Engine Generator, Water Injection Pumps, Fire Water Pumps, Crude Oil Export Pumps, Seawater Lift Pump and etc.
- Manage asset integrity program and maintenance services for production facilities to meet budget, quality, scheduling, Health, Safety, Security, and Environment (HSSE) policy and integrity standard.
- Manage Engineering projects for modification and upgrade facilities, process and equipment.

EXPERIENCE STATEMENT

Specialties:• Excellent coordination skills :-

• Project Management • Communication • Technical Skills
• Interpersonal Skills • Delegation • Teamwork
• Visionary Leadership • Quality Management • Strategic Thinking
• Planning/Organizing • Adaptability

Specialties: various Rotating Equipment’s Handle Includes;-

• Centrifugal Compressors • Reciprocating Compressors
• Rotary Screw Compressors (oil flooded & oil free)
• Fans & Blowers • Gas Turbine Generator Sets
• Diesel Engines Generator Sets
• Horizontal CF Pumps (Single/Multistage & High Speed)
• Rotary pumps (screw/gear/vane/progressive cavity)
• Packages like; chemical injection, DM water treatment, seawater filtration,
& Nitrogen

GENERAL SKILLS:
• Acquainted with Layouts, Civil foundation dwgs, Piping Specifications, etc.
• Acquainted with Logic diagram, Loop diagrams, Hook up diagrams, etc for Reciprocating Compressors.
• Acquainted with Preliminary flow diagrams & P&ID’s of Refineries.
Preparation of Feed document

Rotating Equipment:-
Pump, Fan, Blowers, Fin Fan Cooler, Soot blowers,Screw feeder, Drag chain feeder, Agitator,Chiller,Cooling tower, Silencer, Divertor and vibration Damper.
Closed Cooling Water treatment package, Fuel Gas Treatment Package,Chemical Injection Package Systems, Sulfacid Treatment Package(FRP Reactor, Droplet Separator, Aerosol Separator

Current to Previous:--------------------------------------------------------------------------------------------

Employer Name: Petrofac Emirates Onshore Engineering & Construction (OEC)
Petrofac International Limited

From: Aug 2015 To: Feb 2016 Location: (Abu Dhabi,UAE)

Position Held & Duties: Commissioning Engineer- Process

PE-103 Commissioning/Completions

ZADCO UZ 750 PROJECTS (EPC-2)

Worked in Petrofac Emirates onshore Engineering & Construction (OEC) ,PETROFAC International Limited as a Mechanical Engineer (Commissioning Engineer, Proces) for the ZADCO UZ 750 project, Abu Dhabi ICAD office, DYNA-MAC yard at Singapore and at the Siemens yard at Batam, Indonesia

Project Experience in this Position:

Job Responsibility:

1. Rich experience in Mechanical discipline Pre commissioning, commissioning, Operations and troubleshooting activities in Oil and gas, Petrochemical and Refinery units.
2. Organize and manage a multi-discipline Engineering Commissioning teams for the execution and timely completion of commissioning activities to achieve major milestones like Mechanical Completion, System Acceptance etc
3. Providing inputs to engineering and design from the perspective of commissioning, operability and preparing the Commissioning manuals
4. Experience in Systems/Subsystem classification, Process Design, Process Safety, Commissioning Scope of Work preparation, FAT, SAT, Permit to work (PTW), Statutory requirements and Performance tests etc.,
5. Preparation and review of Pre-commissioning, commissioning Procedures, start-up execution plan; development of planning and scheduling of pre-commissioning and commissioning plan for entire projects and integration with Client planning for commissioning and smooth start-up,
6. Execution of safe commissioning of the facilities, including HSE compliance, planning, preparation of procedures, verifying compliance of installation to the project specifications, assurance of technical integrity, functional verification of installation, materials and services planning, progress monitoring and reporting, team management and interface management.
7. All Commissioning execution activities are carried out safely and in accordance with the project HSE plan and in line with associated Commissioning JRA
8. Acceptance of formal Handover from contractors at Pre-commissioning completion stage and to ensure acceptable formal Handovers to the Operator are prepared with proper documentation.
9. Verification of Mechanical Completion and Punch List database and documentation monitor and report progress / status and acceptance of MC /Pre Commissioned Sub Systems and Systems.
10. Necessary Utilities Interface commissioning preparation work (monitoring preservation, monitoring of mechanical Completion and Pre-commissioning activities, commissioning temporaries etc.).
11. Management, supervision and coordination of the Commissioning personnel (including Vendor specialists) during Commissioning


. Coordinating and supervising the pre-commissioning and commissioning activities to be performed in a safe manner as per project HSE standards. Reviewing during the construction phase the status of testing and punch listing to ensure systems are turned over to commissioning and start-up in a smooth, safe and efficient manner; Walk-through of the facilities and raising necessary punch lists.


Employer Name: Larsen & Toubro limited, Hhydrocarbon, LLC for Ppetroleum Development Oman (PDO) in Lekhwair Gas Field Development Project

From: Jan 2012 To: Jan 2015 Location: (Oman-Muscat)
Position Held & Duties: Commissioning Manager, (Mechanical Head)

Project Experience in this Position:

Being Project Management Team Member, Monitored Construction, Pre commissioning / commissioning activities (installation of Compressor, Pumps, Air Fin Coolers, HHP Coke Cutting Pumps, Coker Crusher, Conveyors, Overhead Bridge Cranes, Coker cutting drilling mechanism. Reviewed Engineering data of All Machines for Delayed Coker area (i,e Field Engineering / Modifications, Data Sheets, IOM, Test result reports, Drawings, P&IDs, Analysis Data, Procedures, Bid Evaluation, OTPs, MRT procedures, Modification Schemes & Mechanical Seals. I had supported by an active participation to Static / Package Equipment installation/ erection. Performed / interacted Pre-com / commissioning activities through ICAPS implementation. During commissioning, monitored / attended water flushing, chemical cleaning,

De Greasing, air blowing, oil flushing, Motor Solo Runs, Mechanical Run Tests and Operational Tests. During run tests, verified the equipment behavior i.e Temperature, vibration, RPM, Current & Noise results in accordance to approved data / tolerances. Participating in trouble shooting of rotating equipment commissioning work, high vibration, high temperatures in bearings/seals, Dynamic balancing, abnormal noises and equipment performance.

Commissioning Head for Pre-Commissioning & Commissioning of Lekhwair Gas Field Development (LGFD) Project in Oman. I have been associated with Petroleum Development Oman (PDO) for Pre-Commissioning and commissioning of plant including Hydro test (Air- Pigging) & HT Testing of flow line.

Mechanical systems and plants include : oil and gas gathering flow lines and manifolds, separation storage, pumping facilities, offshore loading facilities, piping and pipeline systems, mechanical packages, water and gas injection facilities, utilities including Hydro Test, water treatment, fire-fighting, air compression, including Utilities cooling, fuel, gas pipe line System

Following OPERCOM philosophy to organise activities as follows:
o Defined a list of systems and sub-systems.
o Prepared and evaluated deliverables.
o Marked up P&ID and Single Loop Diagram drawings.
o Followed up on issuing operational test procedures.
o Defined and requested resources needed.
o Checked progress and measurement of documentation management.
o Followed-up, prepared and issued pre-commissioning and commissioning dossiers.
o Coordinated activities with the construction team on site.
Hydrocarbon:-
1. Refinery: GSU,GDU, CDU & VDU
2. Gas: Gas Processing,
3.Plant (IOM): Installation, Operation & Maintenance for Rotary and Static Equipment’s
4. GOSP: Gas oil Separation Plant
5. Utilities. Like fuel, gas ,hot and cooling water line system
6. Installation & Commissioning of RO, waste water treatment
Employer Name: Saipem (ENI) Engineering EPC & EPCIC Project

From: Jan 2010 To: Jan 2012 Location: Abu Dhabi, UAE

Position Held & Duties: Senior Package & Rotating Equipment Engineer

Project Experience in this Position:

Leading Multi discipline Pre-Commissioning activities, attending acceptance committee, Mechanical Completion, Progress / Coordination and subject specific meetings. Part of RCIs / RCIs assessment, Maintenance Procedure development, technical support to project and several associated works. Also performing “technical Bids Evaluation, Detail and Field Engineering / Modifications / Response to Site Technical Queries, review of Data Sheets, IOMs, FAT reports, GAD/Cross Sectional Drawings, P&IDs, Analysis Data, modification Schemes & Mechanical Seals.

I am also reviewing Static / Rotating Package Equipment technical data. Leading Pre-Commissioning activities of Rotating equipment, Procedures reviews for activities of water flushing, chemical cleaning, De Greasing, air blowing, oil flushing, Motor Solo Runs, Mechanical Run Tests and Operational Tests. Reviewing and confirming performance curves for machines, Equipment Bases / base plates Adequacy, Anchor /Foundation design Load calculations, Axial forces versus axial deflections, Painting Specifications, MDR (Manufacturing Data Reports / Books), Spare Parts and variety of relevant documents.

Lead main rotating equipment “Power Generation/ Oil Transfer pumps/ Water Injection pumps “ Off-Shore Flowserver/Nuovo Pingone/Ge /Weir Cabioneta. Defining scope of work, preparing technical bid, based on the needs expressed by the customer.Scheduling of major maintenance activities and other technical and operating programs.
Advise on rotating equipment availability, sparing philosophies and standardization.
Recommend selection of vendors and contractors for the purchase of materials, equipment, and supplies and contracting of engineering consultants and specialized technical services to improve operating efficiency.

Participates in the development, implementation, and evaluation of the effectiveness of systems and procedures to improve maintenance plans, policies and programs.
Supports maintenance department activities associated with the technical operations related to mechanical, Rotating Equipment (Gas turbine, Centrifugal Compressors, Generators and Screw compressor)

Daily Monitoring Following Activities are as follow…

Supervise Rotating Equipments Maintenance schedule for the following units
Pump Stations, Storage Tanks, Flare Area, Waste Water Treatment and Sulfur Solidification

Supervise daily activities planned and corrective maintenance for rotating equipment’s (pumps, compressors, blowers, agitating mixers, Dissolved Air Floatation, Clarifiers … etc.)

Prepare Quality Plans and Check lists for Major Overhauls

Prepare Training Programs for Technicians

Supervise & provide technical support to maintenance individuals (engineers & technicians) during maintenance activities of equipment’s.

Job Risk Assessment & pre-task meeting is my responsibility for new jobs

Contribute in the department paper work routine such as daily progress and coordination meeting, daily reports, monthly reports, work orders and spare parts material list

Define Root Cause of failures and find permanent solutions for repeated problems

Define new equipment specifications according to requirements within guiding standards

Prepare spare parts drawings for spare parts fabrication in internal or external workshops, also review & check for accuracy

Employer Name: UB Engineering, India Limited..Hazzira-Surat
From: Dec 2007 To: Jan 2010 Location: Surat, India
Position Held & Duties: Maintenance Superintendent

Project Experience in this Position:

Supervised the maintenance function and ensured that maintenance assignments are carried out in an efficient and safe manner. Troubleshoot plant and equipment. Supervise maintenance staff directly.
Responsible for preventive maintenance systems, inspection routines, inventory control, job scheduling , staff training.
Controlled maintenance expenditure in a cost effective way according to the site budget for site repairs, resources, direct labor, overtime and contractors
Strived for zero incidents and ensure a people centered safety culture exists within the department.
Managed maintenance projects from ideation through completion
Planned and scheduled routine preventive maintenance that resulted in accelerated downtime reduction
Improved productivity by using continuous improvement practices
Lead root-cause investigations
Responsible for the management of 250 employees
Ensured smooth operations by proper training, instruction and communication with shift supervisors.
Supervised, mentored, and coached the maintenance team to improve quality, safety and total production output.
Performed different tasks, including: human resource management, manufacturing resource planning, cost analysis and budgeting.
Drive the continuous improvement process.

Plans and coordinates maintenance of equipment within a department in a proactive fashion to maximize equipment uptime and verifies repairs are effective. Effectively utilizes computerized maintenance management systems (CMMS). Forms and leads teams to improve plant maintenance capabilities. Accountable for planning and scheduling department maintenance, repair and installation of production machinery and equipment. Schedules daily and weekend/down day maintenance work and maintains an up to date log of work that needs to be accomplished. Provides technical expertise, guidance and leadership for Multi-crafts, Electricians and Mechanics. Major interactions include plant management and supervision, maintenance personnel, vendors, engineers, purchasing, technical services and contractors.

Responsible for the Maintenance of Vessels, Columns, Heat Exchangers, process heaters, spheres, Air Fins Coolers, LPG Treater (Replacement of Catalyst). Dismantling & Reinstallation of PSVs, NRVs, MOVs, and CVs for Maintenance / refurbishment.

I have Performed Pressure Testing (Hydro / Pneumatic) of different equipment’s i.e Piping / Heat Exchangers & Valves. Replaced the internals of Vessels in Gas treatment Unit (DGA, Swirl Deck, Demisters, Packing’s, Grids). Bolt Tension and De tension/ Torquing of 45000 Rating Flange joints, Gray locks Joints. Hydro jetting of Heat Exchangers, Modification of Plate Type Heat Exchangers, Modification of Glycol Package in Gas Plant, Modification Of Centrifugal Dryers, Replacement Of Screw Conveyers, Replacement Of Rotary Feeders, Pumps Etc.

Overhauling of cooling towers (Wooden / Fiber), replacing the carbon / multimedia filters. Coordination of In situ machining of damaged flange faces for air coolers plug seats, heat exchanger’s flanges. Organized resources, assigned Engineers / supervisors and distributed manpower (100 to 250) according to Job priorities Keeping Efficient Job Practices. I have / had maintained best Quality and Safety outputs throughout the assigned tasks.
=================================================================================

Employer Name: DANEM ENGINEERING WORKS, W.L.L
From: Dec 2003 To: Dec 2007 Location: Doha-Qatar
Position Held & Duties: Project Engineer….

Project Experience in this Position:
As a Project Engineer, at Qatar Refinery Gas plant & QAFCO-5 Urea Plants. Responsibilities were to supervise the installation and erection of rotating equipment’s such as Steam Turbine, Axial / rotary Compressor, Blower, Horizontal Pumps, Vertical Pumps, air fin coolers and relative accessories i-e, oil skids/chemical injection skids. Executed and Inspected the Quality of work as per client & vendor’s given data / specifications. Coordinated with Client, Vendors (Dresser Rand, KSB, S&T, Sundyne) and Sub-contractors. (Single point contact among all parties for major machines work).
During Installation of Sales Gas / Propane Gas Compressors, Installed Dry Gas Seals with vendor Rep. Raised & Submitted lessons learnt observed as design deviations for rotating equipment’s inline to API 610, 611, 612, 617,618, 611, 673, 675, & for Installation API 686, performed grouting (Shrink / Non Shrink), Took effective efficient part in modification of Motor Bases for GE and KSB equipment’s. Re designed the Lubrication route of Air fin cooler’s bearings.
Gas Oil Refinery, QAFCO (Qatar Fertilizer Company S.A.Q),For Plant Maintenance and Shutdown activities, in additional for Working in QATAR Fertilizer Company (S.A.Q) on Static/Rotating Equipment’s likes Heaters, Burners, Exchangers, Vessels, Columns, Pumps and Compressor etc. at Urea-2 Plant areas as a Shutdown Execution Interface Coordinator
Worked in the Annual turnaround of Ammonia 1 Plant for repair of the auxiliary machineries like Compressor, pumps, hydraulic system, Pneumatic Lines and all types of Valves as per work order as a Maintenance Engineer.

I have completed THREE Shut Down In Qatar Refinery and CAFCO Plant and India also as a shut Down Co-coordinator to look after all Rotary, Static Equipment Activities including Piping and Holding PTW for issuing of Permit.

•Plan and supervise the execution of maintenance activities (preventive, corrective and proactive).
•Plan and supervise the execution all the related activities in the planned and emergency shut downs.
•Provide technical support to the junior engineers and technicians.
•Review spare parts stock level and make the required changes based on any changes in the requirements or the purchasing process.
•Handle maintenance issues, perform special analysis and prepare reports in the equipment history.
•Analyze current processes and recommend changes to improve the quality of maintenance work if it required.
•Work to ensure spare parts availability for critical equipment within the assigned area.
•Participated in construction, pre-commissioning and commissioning for new projects

New Construction of Qatalum, SOLIOS, SNC-LAVALIN Plants—Doha-Qatar
Shut Down Responsibilities:
• Supervision, monitoring and coordinating of all shutdown activities which include maintenance, inspection and testing of gas plant.
• Coordination and liaising with owner /client for shutdown preparation and activities.
• Close supervision, coordinating and Extraction of U Tube and straight tube bundles of exchangers, using Bundle puller.
• Inspection of U tube bundles for corrosion and witness NDE examination where required.
• Overhaul, servicing and inspection of Static Equipment.
• Servicing of various types of rotating equipment such as valves, pumps and compressors.
• Maintenance of all major static equipments like heat exchangers, fin fan coolers, columns, and pressure vessels.
• Maintenance of high pressure shell and tube heat exchanger involving cleaning of fouled tubes with the help of high pressure pumps/ water jetting up to 20,000 PSI pressure with the help of power lance and with the help of hydrokinetic method.
• Hydro testing for high pressure vessels and shell and tube heat Exchangers.
• Supervision of scaffolding erection safe for use.
• Final handover of shutdown activities and documents
Daily Activities……
Supervise planned, corrective maintenance and major overhauls activities for mechanical equipment’s (pumps, compressors, valves … etc.)

Job Risk Assessment & pre-task meeting is my responsibility for new jobs

Contribute in the department paper work routine such as daily work activity and coordination meeting, daily reports, monthly reports, work orders and spare parts material list

Define Root Cause of failures and find permanent solutions for repeated problems

Define new equipment specifications according to requirements within guiding standards

Prepare spare parts drawings for spare parts fabrication in internal or external workshops, also review & check for accuracy


Employer Name: Indian Oil Limited,India, IOL
From: Nov 1996 To: Dec 2003 Location: India
Position Held & Duties: Senior Maintenance & Reliability Engineer……

Project Experience in this Position:
Works with project engineering to ensure the reliability and maintainability of new and modified installations. The reliability engineer is responsible for adhering to the life cycle asset management (LCAM) process throughout the entire life cycle of new assets.
Participates in the development of design and installation specifications along with commissioning plans. Participates in the development of criteria for and evaluation of equipment and technical MRO suppliers and technical maintenance service providers. Develops acceptance tests and inspection criteria.
Participates in the final check-out of new installations. This includes factory and site acceptance testing that will assure adherence to functional specifications.

• Develops effective PM’s and makes recommendations to improve maintenance work practices
• Forecasts, plans and develops schedules for maintenance and project work
• Makes recommendations to improve efficiency of Skilled Trades Crew, Work Methods and Plant Equipment
• Prepares reports and communicates plans to Plant Personnel. Works with the JDE CMMS, Report Generation Software, Excel and Access Databases to produce needed reports and statistics. Collects and analyzes data to determine root causes and recommends solutions

Monitoring following as a Senior Maintenance Engineer:
• Managing the installation of new machinery/plant using sound project management techniques.
• Managing and developing a team of technicians to ensure maximum possible plant uptime.
• Managing the maintenance system, budgets, spare parts inventory and planning processes.
• Providing support to technicians and factory operation teams regarding continuous improvement activities relating to safety, quality, and cost efficiency.
• Ensuring optimum production results in terms of quality, cost and quantity and improving resources in the department.
• Ensuring the timely response and repair of breakdowns for all plant machines and equipment.
• Analyzing problems and implementing corrective actions to improve problems and follow up on the implementation (PDCA concept).
• Motivating employees, ensuring adequate training and supervising of the quality of work.
• Coordinating with other departments and service contractors to ensure optimum overall service levels from the Maintenance function.
• Improving and implementing adequate preventive maintenance systems and including new equipment in the preventive maintenance schedule to prevent process or equipment non-conformances.
• Establishing, implementing and reviewing procedures and work instructions describing the functioning of the department and responsibilities
o Maintenance Programs:-
• Special training: RCA (reliability centered maintenance), TPM (Total Productive maintenance), performance and efficiency engineering, lean manufacturing, metrics, and troubleshooting techniques
o Preventive:

Preventative maintenance is maintenance that is regularly performed on a piece of equipment to lessen the likelihood of it failing. Preventative maintenance is performed while the equipment is still working, so that it does not break down unexpectedly.

• Preparation and implementation of preventive maintenance schedule in cement mills and packers plant..
• Follow up check lists and inspection bulletins for all equipment’s
• Technical analysis of operation troubles and support in finding solutions
• Participation in the root causes Analysis for any problem.
• Take care of quality assurance of the maintenance activities and compliance with accepted standards in work through constant monitoring.
• Assist in creation a lubrication program with the lubrication intervals of the plant’s equipment’s.
• Perform shaft alignment jobs to plant’s Machinery.
o Predictive:

• Development and implementation of data collection systems and programs, fault trees, root cause analysis, temperature and vibration spectrum analysis, lubrication analysis, thermal growth, alignment and bearing management, Infrared monitoring and analysis, report and procedure drafting, and trend analysis and spectrum generation to prevent breakdowns
o Corrective:
• Development and implementation of corrective actions such as laser alignment, balancing, lubrication plans, maintenance frequency, and training


Six Sigma process also has been applied not only to "fix it right but fix it right once" to sustain the gains through the use of the MAIC (Measure, Analyze, Improve and Control) process

Control Engineer Activities:-

With the role of Control Engineer I'm responsible for engineering activities of all aspects dealing with machinery and process control of rotating equipment such as steam turbines, electric motor driven centrifugal compressors and reciprocating compressors, turbo expander.
Managed important and relevant Jobs with customers of different Countries (America, Japan, Spain, Germany, Russia, China). Involved in different and challenged requisition projects, enlarging own vision also to disciplines not familiar with (i.e. mechanical ones), giving ideas to solve problems faced. Managed relationship with customers (also through Hazop and other several meetings) and with manufacturers and suppliers, planning and always respecting due dates.
Worked as control engineer: issuing detailed control documents, control panel specifications and antisurge control valves/flow element data sheets.
Contributed in the internal department realizing technical standards and manuals.
Department entry point for all non-conformities coming from the sites, giving immediate support (main requisition) with customers’ satisfaction.
Strong effort given to support LEFS (Low Emission Fuel Skid) site (Alliance Pipeline) commissioning/start-up in Minnesota – Albert Lea (two months)
Worked with dynamic simulation department for validation and testing of control logic of expander compressor skid
Six Sigma methodology
 Root cause analysis (RCA) and root cause failure analysis (RCFA)
 Failure reporting, analysis and corrective action system (FRACAS)
 Works with Production to perform analyses of assets including:
 Overall equipment effectiveness
 Other parameters that define operating condition, reliability and costs of assets
Computerized maintenance management systems (CMMS):-
• Keep the maintenance cost for product or service as low as Possible
• Meet the Quality requirements of the Product.
• Meet the availability requirement for critical equipment.
• Keep the maintenance costs as low as possible for Non-critical Equipment’
=================================================================================
Employer Name: HINDUSTAN PETROLEUM CORP.LTD (HPCL)

From: Sep 1991 To: Nov 1996 Location: India
Position Held & Duties: LEAD ROTATING EQUIPMENT ENGINEER AND PROCESS ENGINEER…

Project Experience in this Position:

As a Process Engineer…..


The Lead Mechanical Engineer provides support to the Engineering Manager and is responsible for supervising a team of qualified mechanical engineers and designers. Provides leadership and resolution on all technical issues related to the practice. The Lead Mechanical Engineer defines and develops the plan to meet the project requirements and manages the group to achieve the expected results on quality, cost and schedule. In addition to assisting in the resolution of technical issues the Lead Mechanical Engineer resource allocation, budgets, training of personnel, and overall coordination with other disciplines.

Main Activities….

- Preparation of technical specifications, design calculations and piping and instrumentation diagrams
- Plans and prepares contract specifications, bid evaluations and award recommendations
- Review of design documents of equipment manufacturers or subcontractors and preparation of comments and recommendations
- Prepare conceptual designs, studies, reports or proposals
- Prepare material quantity estimates
- Prepare letters to contractors and clients
- Coordinate engineering efforts in assigned areas between other engineering disciplines, with the client, suppliers, and contractors
- Performs or assists in the performance of problem analysis and original design
- Perform work that involves conventional engineering practice but may include complex features such as resolving conflicting design requirements, unsuitability of conventional materials and/or difficult coordination requirements.
- Review and checking work of subordinate engineers
- Assist in on-the-job-training of assigned personnel
- Team Management; staffing, hiring, work plans long and temporary assignments
- Manage changes in the Contractor’s scope in order to minimize construction difficulties and cost during construction phase
- Follow up procurements issues and project schedule plan
- Conducting Annual Performance Reviews, coaching, and career development discussions with team members
- Prepare Preliminary design report which defines the scope of work with the client
- Keep all the team dedicated with the quality requirement and keep them familiar with internal/external audit reports and let them participate in closing its actions
- Participate in formal presentations as required to Management and clients
- Support the creation of a work environment that fosters openness, trust, communication, teamwork, empowerment, innovation, and satisfaction


Employer Name: Defence Projects…..
From: Jul 1989 To: Sep 1991 Location: Vladivostok, USSR (Russia)
Position Held & Duties: Junior Asst Engineer
Work involves preparation of enquiry, offer review, preparation of order document, vendor document review
Employee as a Jr Mechanical Engineer in Rotating Equipments Commissioning/Testing at Russia (U.S.S.R) (Vladivostok) for Pre-commissioning and commissioning of Rotary Equipment

GENERAL INFORMATION

Complete Contact details: +66-891220547
Email Address: yadav.saipem@gmail.com

Current Location: Bangkok,Thailand

PERSONAL DETAILS:
 Name: : Pal Chhatter Yadav
 Nationality: : Indian
 Pass Port: Date of Issue :18.03.2013
 Date of expire :17.03.2023
DECLARATION:
I. I, Pal Chhatter Yadav hereby declare that the information’s furnished above by me are true and correct.
2. I, request you to consider my application favorably and give me an opportunity to serve in your organization. I assure you that i would strive hard to bring credit to your esteemed organization.
Thank you for your time and consideration.

(Pal Chhatter Yadav)

Dated:- 03.03.2016


 Training Experience:


 Other Information:
 Hobbies:  Music
 Height:  174 cm  Weight:  73 kg
 Hair Color:  Black  Eye Color:  Brown
 Blood Type:  O  Astrological Sign:  Gemini


   Address: Unit 303, Long He Building, No.78, An Wai Avenue,Dong Cheng District, Beijing 100011 China
   Telephone: 010-51697538 021-61900630 020-61130060 0755-61289740   Fax: 010-51697539
   Copyright @ Jobsite China All Right    Email: service@jobsitechina.com
   JingICPBei: 13019686-6